Qianhe / Guides

Why quotes differ 30% — and how to compare them.

The same drawing sent to five Chinese factories comes back with five different prices. Here is why that happens, and the five lines that make quotes comparable.

Written by the Qianhe Sourcing team, Guangzhou · Last updated November 2026

Short answer: when quotes differ by 30%, they are usually not pricing the same product. Each supplier fills the specification's gaps with its own assumptions — a cheaper material grade, a thinner gauge, an excluded finish, an ambiguous incoterm. The low quote is not cheap; it is answering an easier question.

Where the difference actually comes from

Specification gaps. "Aluminium window, white, 1.4mm" leaves dozens of decisions open: thermal break or not, which hardware brand, single or double glazing, what glass build-up, which gasket system. Each factory answers those gaps differently, and the price moves with every answer.

Material grade substitutions. 201 stainless instead of 304. A moisture-content shortcut on timber. Fillers in the board. None of this shows in a quotation line; all of it shows in year two.

Cost lines quietly excluded. Moulds, samples, packaging design, export cartons, loading labour, inland freight to the port, export customs paperwork. Every one is a real cost; whether it sits inside the unit price or ambushes you later is the difference between two "cheap" quotes.

Incoterms doing quiet work. FOB versus EXW versus CIF can be a 5–12% swing on the same goods — freight, insurance, local charges and documentation all move. Quotes on different terms are not comparable until they are restated on the same term.

The five-line comparison

To make quotes comparable, restate every quote on the same five lines:

LineWhy it decides the comparisonTypical swing
1. Written specificationEvery supplier prices the same document, not their own assumptions10–25%
2. Unit price at a stated quantityUnit prices are volume-dependent5–20%
3. One-time costs separatedTooling and samples hidden in the unit price distort everything2–10%
4. Trade term and named pointFOB / EXW / CIF are not the same product5–12%
5. Price validityA price that expires in a week is a different offer2–8%

1. Specification, written. One document that both suppliers quote against — materials, grades, tolerances, finish, packaging. If a quote arrives without referencing it, send it again and ask for the number against that document.

2. Unit price at a named quantity, because unit prices are volume-dependent. Compare at the same quantity or not at all.

3. One-time costs separated — tooling, samples, test reports — and tooling ownership stated.

4. Trade term and named point — FOB which port, EXW which city — plus who books the freight.

5. Validity — how long the price holds, and what raw-material movement does to it.

Once every quote sits on those five lines, the differences that remain are real differences between factories — and a quote that stays competitive after being restated honestly is one worth pursuing.

Common questions

Should I just pick the cheapest quote?

+

Not before the five lines are aligned. After they are, the cheapest quote on equal terms is often a genuinely efficient factory — but check why: newer machines, scale, or a thinner margin strategy are good reasons; a substituted material grade is not.

How many quotes should I collect?

+

Three serious ones beat eight casual ones. A quote costs a factory real work; suppliers who know a tender is genuine quote more carefully. Send the same written specification to each, and compare on the five lines.

What if a supplier refuses to itemise?

+

Itemisation is where negotiation happens, so some factories resist it as a matter of habit. Push once, politely, with a template. A factory that still refuses to separate one-time costs from unit price is telling you where the flexibility is — and where the audit trail won't be.