Qianhe / Products / Windows & Doors

System windows. A window is a hole in a waterproof building. The frame is the easy part.

Thermally broken aluminium systems, sliding and lift-slide doors, glass build-ups and hardware, supplied as one system from one source. This category is not judged on the bench. It is judged on a wall that someone else built, in the third winter.

What we buy

  • Casement, awning and tilt-turn windows. 60 to 90 mm thermally broken series, PA66-GF25 break, powder-coated, anodised or wood-grain finish.
  • Sliding and lift-slide doors. two and three track, pocket and corner sliders, folding doors for terraces.
  • Glass build-ups. double and triple IGU, low-E, laminated PVB or SGP, warm-edge spacer, argon fill — specified against a Uw target, not against habit.
  • Hardware. multipoint locks, friction stays, hinges and handles, from the named brand or a documented equivalent, with the locking points counted against the schedule.
  • The interface parts. sill pans, flashing profiles, setting blocks, brackets, EPDM gaskets — the parts the installer actually touches.
  • Screens and shading. insect screens, integrated blinds, external louvres and shutters where the project calls for them.

The thing that actually goes wrong

The unit leaves Foshan square and clean, having passed a lab test at 300 Pa. It is installed into an opening built by someone else, in a wall that may not be plumb, on a sill that may not drain. It leaks in the first driving rain.

Almost never because the window is badly made. There are two places to look. Inside the frame: a weep slot covered by a gasket during assembly, or sealed by the installer "to stop the draught". At the interface: no sill pan, sealant where a flashing belongs, and the wrong sequence, so water is trapped behind the bead rather than led out of it.

The second thing is the U-value on paper. A Uw of 1.3 quoted with a 24 mm air-filled IGU in a 60 mm frame is a spreadsheet result. Warm-edge versus aluminium spacer, argon that was actually filled, the glass-to-frame ratio, and whether the tested specimen was the size you are buying — those move the number more than the profile series does.

A window is tested on a bench and judged on a wall. We buy the parts that decide the second test.

How we handle it

Pricing starts from a window schedule, one line per opening: reference, width and height, frame depth, glass build-up, handing, finish, hardware, Uw target, screen. Every line is priced separately, so a change is a line change and not a renegotiation. Sizes come from site measurement wherever possible; where we have to work from the architect's drawing, the schedule goes back to site to be signed before anything is cut.

One complete unit from the first batch goes on the factory's test rig — water spray to AS 2047, EN 14351-1 or AAMA 501, filmed, with spray pressure and duration written into the report. On a sixty-opening project this is the cheapest hour of the job.

The glass is always made by a different plant from the one that makes the frame. That is normal; what is not normal is accepting the glass plant's certificate for a build-up one step away from the one you are buying. We check the IGU label and its traceability, the spacer, the desiccant and the secondary seal.

Hardware is bought through the brand's authorised channel where the brand is the point. Locking points are counted, marks are checked. A copy is a reasonable decision on a 600 mm bathroom window and a liability on a 2.4 m lift-slide door.

Packing is A-frame or crate, glass never touching frame, corners protected, container loading calculated by cubic metre. More windows arrive damaged by packing than by handling.

Thermally broken aluminium window profiles and insulated glazing corner
Typical MOQ
One container, around 200–300 m² of window area
Lead time
25–40 days after the signed schedule; glass adds about a week
Common standards
AS 2047 · EN 14351-1 · NFRC 100/200 · GB/T 8478
Main clusters
Foshan Nanhai · Zhaoqing · Guangzhou
Buyers
Facade subcontractors · main contractors · developers
Key check
Water test of one complete unit

Questions specific to this line

Can the system be certified for our market?

+

Usually, and the certificate is only worth what its test specimen matches. A report has to name the system, the profile depth, the glass build-up and the size range tested. A certificate for a 1.5 × 1.5 m fixed light in a different build-up says nothing about a 2.4 m lift-slide door. We check the specimen against your schedule first, and where the build-up differs we quote the cost of a re-test rather than promise that it will pass.

Two quotes differ by 40% — what am I missing?

+

Almost always five lines. Profile series and wall thickness (1.4 mm against 2.0 mm is not a small difference in a door). Glass: 5+12A+5 against 6+16Ar+6 low-E laminated. Spacer: aluminium against warm-edge. Hardware: the named brand against a copy with the same shape. Scope: whether screens, sill pans, installation brackets and shrinkage allowance are in the price. And whether the Uw figure was calculated for your sizes or copied from a brochure. Put the five on one page and the 40% usually explains itself.

Who measures the openings?

+

Your site, ideally. We can work from the architect's drawing, but then the production tolerance carries the risk of a 10 mm discrepancy across sixty openings, and that is a conversation nobody wants after the container lands. The practical route: we build the schedule from the drawings, your site checks every dimension and signs it, and only then does cutting start. A day of measuring is cheaper than a container of windows that are 10 mm out.

Do you handle installation?

+

No. We are on the buying side. What we do is supply the interface — sill pans, flashing profiles, setting blocks, brackets — and the installation detail that goes with them, in your language, because the leak that shows up in year two is at the interface rather than in the frame. Signing off someone else's installation method is not something we can do honestly.

Related lines

What the window sits in, and what goes on it